How the Takt Time Calculator works

Takt time = available production time ÷ customer demand. It is the heartbeat of a lean line: each station should finish a unit within the takt time.

Divide total work content by takt time to find the minimum number of operators or stations to balance the line.

The formula

Takt = available time ÷ demand

Worked example

Using the default values shown in the calculator:

Shift length (min)480
Breaks per shift (min)50
Shifts per day2
Customer demand per day (units)860
Total work content per unit (seconds)300
  1. 2 shifts of 430 working minutes = 860 minutes a day.
  2. For 860 units the takt time is 60.0 s; 300 s of work needs 5 operators.

Result:

Takt time (seconds per unit)60.0
Available time per day (min)860
Units per hour needed60.0
Operators needed (work content ÷ takt)5

Frequently asked questions

Takt time or cycle time?

Takt is set by demand; cycle time is how long the process actually takes. Cycle time must be at or below takt.

Sources and further reading